Hydroelectricity Franche-Comté


Hydroelectric power station to be completed for commissioning at the end of 2019 with a two-component H16 contract.

Prefectural authorization for 40 years with a PMB of nearly 200 kW including about 130 kW based on title.

Fall height: more than 6 meters

Flow rate sampled: more than 3 m3 / s (approximately 85% of the winter modulus)

About € 130,000 in work remains to be invested for commissioning.

 