Hydro-electricity Allier (03)
Mill founded in title for 150kW. Land management. Contract H16 to a component started at the end of March 2018 for 30kW injection. Gross drop height: 3.78 m – flow rate: 4 m3/s. Site equipped with a Francis turbine. Possibility to install a second turbine. Ecological continuity at the charge of the commune, owner of the dam. Price for 100% of goods: Consult us.