Too late !

Hydro-electricity Allier (03)


Mill founded in title for 150kW. Land management. Contract H16 to a component started at the end of March 2018 for 30kW injection. Gross drop height: 3.78 m – flow rate: 4 m3/s. Site equipped with a Francis turbine. Possibility to install a second turbine. Ecological continuity at the charge of the commune, owner of the dam. Price for 100% of goods: Consult us.

By continuing to use the site, you agree to the use of cookies. More information

The settings of cookies on this site are set to 'accept cookies' to offer you the best possible navigation experience. If you continue to use this site without changing your cookie settings or you click "Accept" below, you consent to this.

Close